Manchester driveways run long, so a fresh seal protects a lot of asphalt. We have sealed Manchester driveways every season since 2023.

A typical Manchester driveway we seal is about 4,900 square feet, and we fill the cracks first.

Anthony’s Asphalt crew sealing a residential asphalt driveway
Two-person crew sealing a home driveway.
  • Since 2023sealing Manchester every season
  • 4.9★234 Google reviews
  • 1,500+sealcoating jobs since 2023
  • 2009in business since

Get your exact Manchester price

Your price depends on the driveway size, the cracks and how dirty the surface is. We measure on site and give you an exact written price. The estimate is free.

Every job includes crack filling before the sealcoat goes on.

How we seal a Manchester driveway

  1. 1
    Clean
    We blow off all dirt and debris. Heavy dirt, weeds or moss can need extra cleaning.
  2. 2
    Fill the cracks
    Cracks are cleaned, heat-lanced, then filled with hot-pour rubber and finished with an overband.
  3. 3
    Seal
    We spray or squeegee the asphalt-based sealer, edge to edge.
  4. 4
    Keep off
    No traffic for at least 24 hours. For driveways we recommend 48 hours.

Before and after

Freshly sealed black asphalt driveway with a yellow caution line
Fresh coat, taped off to dry.
Long sealed asphalt driveway leading to a home
A finished driveway, deep black again.
Two crew members squeegee sealer onto a long residential driveway
Sealer goes on by squeegee or spray, as the surface needs.

Book your Manchester sealcoating

Free estimate. We measure, check the cracks and give you a written price.

Manchester sealcoating questions

How much does driveway sealcoating cost in Manchester?

It depends on the driveway size, the cracks and how dirty the surface is. Manchester driveways are long, about 4,900 square feet on average. We measure on site and give you an exact written price. The estimate is free.

How often should I reseal my driveway?

Most driveways need a new coat every 2 to 3 years.

Do you fill the cracks first?

Yes. Each crack is heat-lanced, filled with hot-pour rubber sealant and finished with an overband before the seal goes on.

When can I drive on it?

Keep all traffic off for at least 24 hours. For driveways we recommend 48 hours.

More in Manchester